Continuing from my last post, of course the gremlins crept in...and right off the bat too! Installing two switches and 4 LED's, the LED brightness was compromised (for some reason!), so I went to RS and bought 4 green-only LED's and installed them that way, the LED being lit for the route selected vs a bi-color LED. I like the look better anyway! By the time I got all that purchased, figured out and done, half the day was over! Is it just me or is time going fast for you too?
Now that the Loop turnouts and LED's were complete it was time to turn to the two control panels at Fresno. This went much smoother, however, due to time, I was only able to complete 1/2 of one panel. It went quickly so I figure I can get both panels complete if I just spend 1 more whole day doing just that. This weekend...hmmm.
This is a blog about my railroad, the Central Pacific Railway, a 500+sqft double-decked N Scale railroad modeling the area from Mojave to Fresno, California. It is based on the modern era UP and BNSF railroads. I also have a web site at www.CPRXrailway.com you can visit.
Search This Blog
Thursday, October 13, 2011
Tuesday, October 11, 2011
DS64 installation almost complete
I've got almost all the DS64's installed and turnouts connected. Just a few more and then complete the installation of the two panels at Fresno Yard. As planning and reality connect, I "plan" to have all this done today. Let's see what reality allows! Once this project is done I can get all the crap that is normally under the layout out of the dining room (now a storage area!) out of the dining room and back in the train room. Ideally, I'd like this done by the end of the month! Planning vs reality again! Fingers crossed...LOL. Now, once the turnout control is handled we'll have a test run session to make sure everything works.
Subscribe to:
Posts (Atom)