Accomplished lots of progress since the last post. The majority of the DS64 installation is done except for a few turnouts, which need the Tortoise's installed due to inacessable locations.
I started the installation of the BNSF staging cut-off and have the subroadbed and cork down and cut through the back board where the track will traverse. Tomorrow I will start and hopefully complete the track installation there. Then the next step will be to install the Tortoises for those 4 turnouts and I hope to have those done by the end of the month.
The control panels for Fresno are 99% complete. Just a couple more turnouts to install, again due to inacessable locations.
I'd say, that's a lot of progress! Onward!